VDOT: “The Virginia Department of Transportation will reopen the original Interstate 95 northbound bridge over the Rappahannock River in mid-November, doubling capacity in the Fredericksburg area ahead of the Thanksgiving holiday.”
“Starting early Thursday, Nov. 16, travelers will be able to use both I-95 northbound bridges over the Rappahannock River. At that time, traffic will be divided between local and through lanes, similar to I-95 southbound between exit 133 (Falmouth/Warrenton) in Stafford County and exit 130 (Route 3) in Fredericksburg.”

I-95 Northbound: Exit 130 (Route 3) to Exit 136 (Centreport Parkway): Monday – Friday, 10 p.m. – 5 a.m. I-95 northbound will be reduced to one lane each evening between the interchanges for construction with I-95 Northbound Rappahannock River Crossing project and the 95 Express Lanes Fredericksburg Extension project.
- Exit 130 (Route 3) to Exit 133 (Route 17): Tuesday – Thursday, 8 p.m. – 6 a.m. Work zone to reopen the original I-95 northbound Rappahannock River Bridge.
- Tuesday Night: 8 p.m. – One lane closed, 9 p.m. – Two lanes closed, 10 p.m.- Off-ramp to Route 17 at exit 133 closed, detour to exit 136 (Centreport Parkway).
- Wednesday: 4:30 a.m. – One local lane of I-95 northbound will open from the Rappahanock River to exit 133. The off-ramp to exit 133 will also reopen.
8 p.m. – One through lane will close, 9 p.m. – I-95 northbound will be reduced to one lane over the river to exit 133, 10 p.m. – Brief, intermittent stops will occur at the on-ramp from Route 3 to I-95 northbound at exit 130, this ramp will not close. - Thursday: 4:30 a.m. – Access to 95 Express Lanes modified. Local traffic from Route 3 or Route 17 will not be able to access the northbound 95 Express Lanes until a new flyover ramp opens in December. 6 a.m. – All six northbound lanes across the river will open to traffic.
- Exit 133 (Route 17) to Exit 136 (Centreport Parkway): Wednesday – Thursday, 9:30 a.m. – 3:30 p.m. Single lane closure between interchanges for 95 Express Lanes Fredericksburg Extension construction.
- Exit 140 (Courthouse Road) to Exit 143 (Aquia/Garrisonville): Monday?β?Friday,?9 p.m. β 4:30 a.m. Single lane closure at mile markers 140-142. Noise barrier construction on the 95 Express Lanes Fredericksburg Extension.
- Exit 148 (Quantico): Tuesday?β?Wednesday,?9 p.m. β 4:30 a.m. Single lane closure at 9 p.m. followed by double lane closures at mile markers 147-149 for 95 Express Lanes Fredericksburg Extension work.
I-95 Southbound: Exit 148 (Quantico): Wednesday?βThursday,?9 p.m. β 4:30 a.m. Single lane closure at 9 p.m. followed by double lane closures at mile markers 149-147 for 95 Express Lanes Fredericksburg Extension work.
- Exit 140 (Courthouse Road): Tuesday β Friday, 9 p.m. β 5 a.m. Varying single and double lane closures between mile markers 140-138 with full traffic stops for construction on the 95 Express Lanes Fredericksburg Extension.
- 9 p.m. Single lane closed, 10 p.m. Two lanes closed, Midnight β 3 a.m. Full intermittent traffic stops for up to 30 min. intervals, 5 a.m. All lanes open.
- Exit 136 (Centreport Parkway) to Exit 133 (Route 17): Tuesday – Thursday, 9:30 a.m. – 3:30 p.m. and Tuesday – Wednesday, 5 a.m. – 9:30 a.m. Single lane closure for 95 Express Lanes Fredericksburg Extension project.
Stafford County: Route 17 Northbound and Southbound: Sunday β Friday, 8 p.m. β 7 a.m. Alternating lane closures on Route 17 northbound and southbound for roadwork between Short Street and I-95. Construction for the I-95 Northbound Rappahannock River Crossing.
- Route 610 (Garrisonville Road): Thursday β Friday, 9 p.m. β 5 a.m. Mobile lane closures for pavement marking work between Mine Road and Joshua Road.
- Courthouse Road/Hospital Center Boulevard: Tuesday β Thursday, 9:30 a.m. β 3 p.m. Single lane closure between Route 1 and Austin Ridge Drive. Construction for 95 Express Lanes Fredericksburg Extension.
- Eskimo Hill Road: Monday β Friday, 7 a.m. β 5 p.m. Single lane closure at the bridge over CSX railroad, with one-way, alternating traffic directed by a flagging crew.
- Old Courthouse Road: Tuesday β Thursday, 9 a.m. β 3:30 p.m. Single lane closure near Park and Ride commuter lots with one-way, alternating traffic directed by a flagging crew. Construction for 95 Express Lanes Fredericksburg Extension.
Stafford County and King George County: Route 218 (White Oak Road/Caledon Road): Monday β Friday, 7 a.m. β 3 p.m. Flagging crew will direct alternating, one-way traffic on Route 218 (White Oak Road) between Route 604 (Belle Plains Road) in Stafford and Route 206 (Dahlgren Road) in King George County for a safety improvement project.
Spotsylvania County: Route 1 Southbound: Monday – Friday, 9 a.m. – 6 p.m. Single southbound lane closure on Route 1 between the intersections of Hood Drive and Market Street. Construction of road improvements under permit for future U.S. Veterans Health Administration clinic.
- Massaponax Church Road: Monday β Wednesday, 9 a.m. β 7 p.m. Paving between Route 1 and Hickory Ridge Road. Flagging crew will alternate one-way traffic through the work zone.
- Southpoint Parkway: Monday β Thursday, 9 a.m. β 3:30 p.m. Single lane closure between Route 1 southbound and Pacific Drive. Bridge construction.
—Virginia Department of TransportationΒ
“Considered the most prestigious award in the public/private infrastructure industry, the P3 Award recognizes the productive partnership among the Virginia Department of Transportation (VDOT), I-66 Express Mobility Partners (I-66 EMP, a consortium of private developers Cintra, Meridiam, and APG), the developer and operator of the 66 Express Outside the Beltway facility, and design/build contractor FAM Construction (a joint venture of Ferrovial Construction and Allan Myers VA).”

I-95 Northbound: Exit 110 (Ladysmith) to Exit 126 (Spotsylvania): Sunday β Thursday, 9 p.m. β 5:30 a.m. Varying single and double lane closures for paving work at mile markers 111-121.
- Exit 133 (Falmouth/Warrenton) to Exit 136 (Centreport Parkway): Monday β Thursday, 8 p.m. β 5 a.m. Varying single and double lane closures between mile markers 134-136 with full traffic stops for work with 95 Express Lanes Fredericksburg Extension.
- 8 p.m. – Single lane closed, 9 p.m. – 5 a.m. – Two lanes closed, Midnight β 3 a.m. Full intermittent traffic stops for up to 30 min. intervals, 5 a.m. – All lanes open.
- Exit 133 (Route 17): Sunday β Friday, 9 p.m. β 3 a.m. Ramp closure. The on-ramp from Route 17 to I-95 northbound will close nightly through early Friday, Nov. 3. During this time, travelers seeking I-95 northbound will be detoured to continue on Route 17 northbound to southbound I-95 and use the loop ramps to enter I-95 northbound. Click here to view an online map of detour.
- Exit 140 (Courthouse Road) to Exit 143 (Aquia/Garrisonville): Monday?β?Friday,?9:30 a.m. β 3:30 p.m. Single lane closure at mile markers 140-142. Noise wall work for 95 Express Lanes Fredericksburg Extension.
I-95 Southbound: Exit 140 (Courthouse Road) to Exit 133 (Route 17): Monday β Thursday, 9 p.m. β 10 a.m. and Thursday β Friday, 9 p.m. β 6 a.m. Varying single and double lane closures between interchanges for 95 Express Lanes Fredericksburg Extension construction.
- Exit 133 (Falmouth/Warrenton) Off-Ramps Closure and Detour: Sunday β Thursday, 11 p.m. β 4 a.m. I-95 southbound off-ramps to Route 17 northbound to Warrenton and Route 17 Business to Falmouth will close each evening with a detour. Drivers will be detoured to exit 136/Centreport Parkway to Route 1 to return to Route 17 Business/Route 17 or use alternate route depending on your destination. Construction for 95 Express Lanes Fredericksburg Extension.
- Exit 118 (Thornburg) to Exit 110 (Ladysmith): Sunday β Thursday, 9 p.m. β 5:30 a.m. Varying single and double lane closures at mile markers 117-108 for paving work.
City of Fredericksburg: Route 1 and Route 3 Ramps: Sunday β Thursday, 8 p.m. β 5 a.m. Alternating lane closures. Travelers may encounter brief overnight delays on Route 1 and Route 3 in the City of Fredericksburg as crews install pavement markings following recent paving. Work will be underway on Sunday through Thursday evening, ending early Friday morning.
- Route 1: Sunday β Thursday, 8 p.m. β 5 a.m. Alternating lane closures on Route 1 northbound and southbound for pavement marking work between Hazel Run Bridge and Cowan Boulevard.
- Route 3: Sunday β Thursday, 8 p.m. β 5 a.m. Alternating lane closures on Route 3 eastbound and westbound for pavement marking work between Altoona Drive and Lafayette Boulevard.
Stafford County: Route 17: Sunday – Thursday, 7 p.m. – 6 a.m. and Friday – Saturday, 8 p.m. – 7 a.m. Alternating lane closures on Route 17 northbound and southbound for roadwork between Short Street and Sanford Drive.
- Courthouse Road/Hospital Center Boulevard: Monday β Thursday, 9:30 a.m. β 3 p.m. and Friday, 9:30 a.m. β 2 p.m. Single lane closure between Route 1 and Austin Ridge Drive. Construction for 95 Express Lanes Fredericksburg Extension.
- Old Courthouse Road: Monday β Thursday, 9 a.m. β 3:30 p.m. and Friday, 9 a.m. β 2 p.m. Single lane closure near Park and Ride commuter lots with one-way, alternating traffic directed by a flagging crew. Construction for 95 Express Lanes Fredericksburg Extension.
- Short Street: Sunday – Friday, 12 a.m. – 3 a.m. Short Street will be closed overnight for milling and paving. Detour will direct drivers to continue south on Route 17 Business to Olde Forge Drive. Click here to view an online map.
- Truslow Road: Monday β Thursday, 9 a.m. β 3:30 p.m. and Friday, 9 a.m. β 2 p.m. Single lane closure near I-95 overpass with one-way, alternating traffic directed by a flagging crew. Paving. Construction for the 95 Express Lanes Fredericksburg Extension.
- Route 633 (Arkendale Road): Thursday – Friday, 8 a.m. – 6 p.m. Mobile lane closures for pavement marking work between Route 611 (Widewater Road) and Route 658 (Brent Point Road).
Stafford County and King George County: Route 218 (White Oak Road/Caledon Road): Monday β Friday, 7 a.m. β 3 p.m. Flagging crew will direct alternating, one-way traffic on Route 218 (White Oak Road) between Route 604 (Belle Plains Road) in Stafford and Route 206 (Dahlgren Road) in King George County for a safety improvement project.
Spotsylvania County: Route 1 Southbound: Sunday β Saturday, 9 p.m. β 6 a.m. Single southbound lane closure on Route 1 between the intersections of Hood Drive and Market Street. Construction of road improvements under permit for future U.S. Veterans Health Administration clinic.
- Route 1: Tuesday – Wednesday, 8 p.m. – 6 a.m. Mobile lane closures for pavement marking work on Route 1 northbound and southbound between Mine Road and Carr Drive.
- Tuesday – Friday, 9 a.m. – 3:30 p.m. Single lane closure on Route 1 for permit work between Route 608 (Massaponax Church Road) and Route 628 (Spotsylvania Parkway).
- Route 3: Tuesday – Wednesday, 8 p.m. – 6 a.m. Mobile lane closures for pavement marking work on Route 3 eastbound and westbound between Gateway Boulevard and Central Park Drive.
- Hall Industrial Road: Wednesday and Friday, 8 a.m. – 7 p.m. Alternating lane closure with flagging for paving work between Massaponax Church Road and dead end.
- Herndon Road: Tuesday – Friday, 9 a.m. – 6 p.m. Alternating lane closures with flagging for pavement work between Brock Road and Orange Plank Road.
- Pamunkey Road: Monday – Tuesday, 9 a.m. – 6 p.m. Alternating lane closures with flagging for pavement work between Post Oak Road and W. Catharpin Road.
- Route 605 (Marye Road): Monday β Friday, 9 a.m. β 7 p.m. Pavement marking placement between Arcadia Road and Blantons Road. Flagging crew will alternate one-way traffic through the work zone.
- Route 607 (Guinea Station Road): Monday β Friday, 9 a.m. β 7 p.m. Pothole patching between Route 1 and Caroline County line. Flagging crew will alternate one-way traffic through the work zone.
- Route 608 (Massaponax Church Road): Monday β Friday, 9 a.m. β 7 p.m. Paving between Route 1 and Hickory Ridge Road. Flagging crew will alternate one-way traffic through the work zone.
—Virginia Department of Transportation
The wider road section is the last in three road projects that began in the early 2000s to widen Route 1 in Woodbridge from four to six lanes between Neabsco Creek to the Occoquan River. l
Officials cut the ribbon on the two-mile Featherstone Road to Mary’s Way segment on Thursday, October 26, 2023.
The work was completed in three segments: Between Neabsco Creek and Featherstone Road, between Marys Way and Occoquan River, and Featherstone Road to Mary’s Way, respectively.
Northern Virginia Transportation Authority: “NVTA invested nearly $64 million to bring this portion of the Route 1 Widening to fruition.”
Project Benefits:
“Reduced congestion: The recently completed project has improved the existing Route 1 segment (Featherstone to Marys Way). The improvements include the widening from four to six lanes, a shared-use path and sidewalks ensuring a seamless flow of all modes of traffic and alleviating congestion challenges in the region. As the regionβs population continues to grow, these additional lanes and improved access to various transportation options within the Route 1 corridor are vital.”
“Improved safety: New and improved safety features, including medians, upgraded intersections, and advanced signalization, guarantee the safety of all road users. Pedestrian signals are strategically placed to ensure safe crossings.”
“Improved active transportation options: A 10-foot shared-use path and a five-foot sidewalk now run alongside the route, providing cyclists and pedestrians with dedicated spaces. These additions will encourage active transportation, promoting a healthier lifestyle for NoVA residents and reducing reliance on motor vehicles.”
“Enhanced regional connectivity: This project improves the connectivity between Prince William County, Fairfax County and the City of Alexandria through improved traffic flow. Additionally, it will improve access to VRE trains via Rippon and Woodbridge Stations.”
OmniRide: “OmniRide invites families to join them for the Transit and Treats Halloween Bus on October 28 from noon-4 pm. The event includes giveaways, snacks, candy, fun activities, and a chance to learn more about OmniRide’s Family of Transit Services. The event is FREE and open to the public.”
“Transit and Treats will take place at two locations along the Route 1 corridor:”
- Triangle Plaza (near Rosieβs Casino), 18050 Triangle Shopping Plaza, Dumfries, VA 22026
- Prince William Plaza (near Americana grocery store), 14490 Jefferson Davis Hwy, Woodbridge, VA 22191
Virginia Railway Express aims to add service on Saturday, starting July 1, 2024.
The state's only commuter railroad aims to run roundtrips on Saturdays on its Fredericksburg and Manassas lines. It's the first time in the railroad's 31-year history that it has suggested running weekend service.
This article is exclusively for our Locals Only members. Please Sign In or upgrade to become a Locals Only Member today! Your support helps us continue delivering more in-depth community news that matters to you.
Prince William police: “Now that daylight is fading earlier, it can be difficult for drivers to notice pedestrians and those on bicycles, so the Prince William County Police Department invites residents to be βStreet Smartβ and aware of pedestrian and bicyclist safety.”
“The βStreet Smartβ education and enforcement campaign, which runs through Nov. 19, 2023, aims to reduce the number of pedestrian and bicycle crashes with motor vehicles.”
A total of 26 people were killed on county roads in 2022.
A design public hearing on this project will be held:
- Monday, Nov. 6, 2023
5:30-7:30 p.m.
Howell Branch, Central Rappahannock Regional Library
806 Lyons Boulevard
Fredericksburg, VA 22406 (Stafford County)
“Virginia Department of Transportation (VDOT) staff will deliver a brief presentation starting at 5:45 p.m. and will be available to answer questions between 5:30-7:30 p.m. in an open house format. Stop by at any time between 5:30-7:30 p.m. to review the proposed project plans and offer comment.”
- Comments will be accepted through Nov. 16, 2023.
- Complete the online comment form on the project page.
- Comments can be submitted by email at [email protected].