Join

ADA-compliant kayak ramp takes seven years to complete

After seven long years, Occoquan’s kayak ramp project is nearing completion.

In 2013, Occoquan was awarded a grant through the Federal Highway Administration’s Recreational Trails Program.

The grant was to be used for the construction of an Americans with Disabilities Act (ADA)-compliant, non-motorized watercraft launch under the Route 123 bridge. The intent of the project is to provide free water access to all in the community, including people with disabilities. 

The ramp was projected to take only a short amount of time to build.

“The town is required to obtain a Commercial Building Permit from Prince William County for the project. The actual construction of the project will take approximately 45-60 days to complete,” stated the town council’s project summary document.

So, why has the project taken seven years to finish?

According to Mayor Earnie Porta, a number of things caused the delay, including personnel changes and securing permits.

However, one of the largest considerations was the exact site of the launch.

“One of the important things about this ramp was that it would be the only free, public access ramp on the Occoquan for people with ambulatory disabilities east of the High Dam. Although it was easy to design the launch itself that way, substantial design changes were necessary to make the slope of the access ramp to the launch appropriate for individuals with ambulatory disabilities,” Porta explained.

According to Porta, this site was chosen despite necessitating design changes because of its shallow water depth and ease of public access — there was already a parking lot nearby.

“The location that ended up being most suitable for public access has a significant slope that required a long switchback ramp to meet ADA requirements. In other words, the ideal location ended up being different than what was originally anticipated, and this necessitated a different kind of ramp,” said Porta.

To make these necessary changes, Occoquan had to find and secure additional funding for the project which, even with the help of Virginia’s Department of Conservation and Recreation, was challenging according to the mayor.

“Truth is that this project would never have come to fruition without the extensive cooperation and commitment of Virginia’s Department of Conservation and Recreation. They stayed committed to this project throughout and persevered through challenges,” Porta said.

Porta did not respond when asked when the kayak ramp would be finished.

Author

Recent Stories

A former Gander Mountain store at 14011 Worth Avenue in Woodbridge will be used as a mental health crisis center. Prince William County is developing a new Crisis Receiving Center…

Tonight’s Game 2 of the Carolina League Championship Series between the Fredericksburg Nationals (FredNats) and the Kannapolis Cannon Ballers has been postponed due to inclement weather.

[Photo by Kindel Media]At the Sept. 9 Manassas City Council meeting, the Department of Public Works proposed charging hourly rates among other fees for using electric vehicle (EV) charging stations…

All four candidates answered our fourth week of candidate survey questions.

Established transportation company has immediate part-time position open as a back-up driver transporting military personnel from the Woodbridge area to Baltimore and Richmond. No CDL required but must be able to pass DOT physical and drug test. Must good driving record and pass criminal background check. Send resume with references to [email protected] or call 606-594-7018

Job details

Employer: Bfs Transportation
Position: 15 Passenger Van Driver
Employment type: Part-time
Workplace type: Fully in-person (in Woodbridge)
Compensation: Not specified
Application deadline: Not specified
Contact for application questions: Not specified

Submit your own Community Post here.

Mozart’s Don Giovanni thrillingly explores the passions and perils of love, morality, and the inevitable fallout of reckless choices, all centered on the daring exploits of Don Giovanni. His seductive adventures ignite intense encounters and fierce conflicts with unforgettable characters like Donna Anna, Donna Elvira, and Zerlina. The electrifying drama pulls audiences into a world of intrigue, where every action has thrilling consequences. Join us at the Embassy of Austria, September 13th at 7:30 pm for what will be an exhilarating night of opera!

Maestro Julien Benichou, Conductor

featuring:

Read More

Submit your own Community Post here.

Propel 2024 “The Launch”

Elevate your spirit and renew your soul at Propel 2024: “The Launch”! This extraordinary conference is more than just an event—it’s a powerful journey of faith, fellowship, and flavorful food designed to inspire and transform. Seize this life-changing opportunity to

2024 Van Metre Cornhole Challenge

Participate in the 2024 Van Metre Cornhole Challenge, where every toss helps build brighter futures, and all proceeds support the construction of ten new townhomes through Habitat for Humanity. Plus, enjoy unlimited food and drinks, and compete for a chance

×

Subscribe to our mailing list