Join

Virginia gives details on ‘huge’ and ‘transformational’ plans to run more VRE trains

The state is investing, and the VRE CEO Doug Allen is excited about plans for a rebuilt Potomac River crossing.

At a VRE Operations Board meeting Friday in Woodbridge, DRPT Director Jennifer Mitchell used those words, “huge” and “transformational” to describe a $1.9 billion project to build a new Long Bridge across the Potomac River.

The Long Bridge links Arlington and Washington, D.C., and is a major bottleneck for east-coast rail traffic.

  • VRE and CSX freight trains compete for space on the bridge, causing delays that ripple across the commuter rail system’s two lines — Fredericksburg and Manassas.
  • DRPT is investing $214 million into a new bridge which Mitchell called a “down payment” on the project.
  • Additional federal and state monies will also be used to make up the difference, she added.
  • In addition to easing congestion, the new bridge will increase capacity allowing VRE to increase the number of trains it runs from 34 to 92 by 2040, a 67% increase.
  • While there’s been no interest from it yet, DRPT says Maryland could run as many as eight of its MARC commuter trains across the bridge into Virginia to what will be a newly expanded Crystal City VRE station, near the site of Amazon’s HQ2.

There’s also room for improvements south of the bridge, like a new $300 million flyover track to be built near the Franconia-Springfield Metro Station, Mitchell told the VRE Board.

  • The flyover would allow trains to easily shift from the east side of the rail tracks to the west, to a commuter-rail-dedicated fourth track for an “unincumbered”  path directly to Long Bridge.
  • The new flyover will increase capacity, too, said VRE General Manager Doug Allen.

“They’re doing a study, looking at the cost of adding a new fourth lane to [Interstate] 95, and, believe me, it costs more than [both of these projects combined],” said Mitchell.

There are no set construction start dates for either project.

  • A draft environmental study for the Long Bridge project has been posted.
  • “Once you get to the point of a draft environmental impact statement, you really have a project there,” said Allen, excited about the prospects for a new bridge.
  • An environmental public hearing for Long Bridge is set for Oct. 22, 2019, in Washington.

Author

  • Uriah Kiser

    I'm the Founder and Publisher of Potomac Local News. Raised in Woodbridge, I'm now raising my family in Northern Virginia and care deeply about our community. If you're not getting our FREE email newsletter, you are missing out. Subscribe Now!

    View all posts

Recent Stories

From smashing a railing to ending up behind one. A group of teenagers were found attempting to flee from an auto accident, according to police.

In a significant shift aimed at enhancing commuter services along the I-66 corridor, the Potomac and Rappahannock Transportation Commission (PRTC) has approved a plan to introduce new state-funded bus routes and eliminate the underused Gainesville-Reston commuter bus route 618.

CFH is hosting its 7th Annual 5K Run-Walk and 2nd Annual Cornhole Toss Tournament at Occoquan Regional Park on October 6, with a virtual 5K option available from October 6 to October 20.

Manassas is gearing up for an engaging Mayoral Forum, scheduled for October 1, 2024. The event, featuring incumbent Mayor Michelle Davis-Younger (D) and challenger Xiao-Yin Tang Byrom (R), will be held at the Manassas Museum, located at 9101 Prince William Street.

Established transportation company has immediate part-time position open as a back-up driver transporting military personnel from the Woodbridge area to Baltimore and Richmond. No CDL required but must be able to pass DOT physical and drug test. Must good driving record and pass criminal background check. Send resume with references to [email protected] or call 606-594-7018

Job details

Employer: Bfs Transportation
Position: 15 Passenger Van Driver
Employment type: Part-time
Workplace type: Fully in-person (in Woodbridge)
Compensation: Not specified
Application deadline: Not specified
Contact for application questions: Not specified

Submit your own Community Post here.

Mozart’s Don Giovanni thrillingly explores the passions and perils of love, morality, and the inevitable fallout of reckless choices, all centered on the daring exploits of Don Giovanni. His seductive adventures ignite intense encounters and fierce conflicts with unforgettable characters like Donna Anna, Donna Elvira, and Zerlina. The electrifying drama pulls audiences into a world of intrigue, where every action has thrilling consequences. Join us at the Embassy of Austria, September 13th at 7:30 pm for what will be an exhilarating night of opera!

Maestro Julien Benichou, Conductor

featuring:

Read More

Submit your own Community Post here.

A Lake Ridge Open House

You’re invited to learn about Fellowship Square, life at Lake Ridge Fellowship

House, and how you can improve the lives of older adults who struggle to make ends

meet. This FREE event will include food, drink, special guests, and raffle

Propel 2024 “The Launch”

Elevate your spirit and renew your soul at Propel 2024: “The Launch”! This extraordinary conference is more than just an event—it’s a powerful journey of faith, fellowship, and flavorful food designed to inspire and transform. Seize this life-changing opportunity to

×

Subscribe to our mailing list