Beginning on or about Monday, September 8, the Virginia Department of Transportation (VDOT) will change the reversal times of the I-95/I-395 High Occupancy Vehicle (HOV) lanes to their regular hours during weekdays, to accommodate rush-hour traffic flow. The I-95/395 HOV lanes will remain open to northbound traffic until 11 a.m. and will reopen to southbound traffic by no later than 1 p.m.
The HOV lanes’ reversible operations have been following a modified schedule during the last two months, to allow the lanes to open one hour earlier for southbound traffic. This schedule change was necessary to help ease congestion on I-95 South, which was intensified due to heavy summer construction work.
Major construction remains underway along Northern Virginia’s heavily-traveled I-95/395 corridor, requiring lane closures with potential traffic impacts. The 95 Express Lanes project, which spans from Garrisonville Road in Stafford County to just north of Edsall Road on I-395 in Alexandria, is in its final months of construction, and is scheduled to open in early 2015. Additionally, work is fully ramped up on the I-95 Shoulder Improvement project in Prince William County, as well as the I-395 North Auxiliary Lane project in Alexandria.
Recent Stories
Prince William County will celebrate America Recycles Day (ARD) on November 15, 2024, as part of a national campaign by Keep America Beautiful to promote recycling.
Daylight Saving Time ends [2 a.m.] Sunday, November 3rd. As you turn your clocks back, the Prince William County Fire and Rescue System would like to remind residents to change the battery in their smoke alarms.
Virginia State Parks has announced that seven parks will undergo extensive cabin and campground renovations starting this fall.
On Friday, November 1, at 1 p.m., Manassas Park City held its annual Veterans Flag Ceremony outside City Hall, paying tribute to the men and women serving in the United States Armed Forces.
Established transportation company has immediate part-time position open as a back-up driver transporting military personnel from the Woodbridge area to Baltimore and Richmond. No CDL required but must be able to pass DOT physical and drug test. Must good driving record and pass criminal background check. Send resume with references to [email protected] or call 606-594-7018
Job details
Employer: Bfs Transportation
Position: 15 Passenger Van Driver
Employment type: Part-time
Workplace type: Fully in-person (in Woodbridge)
Compensation: Not specified
Application deadline: Not specified
Contact for application questions: Not specified
Mozart’s Don Giovanni thrillingly explores the passions and perils of love, morality, and the inevitable fallout of reckless choices, all centered on the daring exploits of Don Giovanni. His seductive adventures ignite intense encounters and fierce conflicts with unforgettable characters like Donna Anna, Donna Elvira, and Zerlina. The electrifying drama pulls audiences into a world of intrigue, where every action has thrilling consequences. Join us at the Embassy of Austria, September 13th at 7:30 pm for what will be an exhilarating night of opera!
Maestro Julien Benichou, Conductor
featuring: